| WE
RECOMMEND THESE HANDLING SYSTEMS FOR SHEEP |
System A
|
SYS-A - 588 lbs. (267 kg)
EQUIPMENT LIST
1 - TS-900 Sorter
1 - RS1200 Raceway Support
1 - RSG24 Stop Gate
1 - AB1 Anti Backup
4 - SP41-08 Solid Panel
2 - FD41-08 Fold Down Panel
10 - S38 Linking Rods
$1,450 |
|
System B
|
SYS-B - 950 lbs. (432 kg)
EQUIPMENT LIST
1 - TS900 Sorter
1 - RS1200 Raceway Support
1 - DP1 Drop Gate
1 - R20 Rope Tie Bar
1 - AB1 Anti Backup
4 - SP41-08 Solid Panel
2 - FD41-08 Fold Down Panel
1 - SW800 Swing Slide Gate
3 - CP41-08 Tub Panel
3 - S44 Tee Rods
13 - S38 Linking Rods
$2,291
|
|
System C
|
SYS-C - 1304 lbs. (593 kg)
EQUIPMENT LIST
1 - TS900 Sorter
2 - RSG24 Stop Gate
1 - DP1 Drop Gate
1 - R20 Rope Tie Bar
1 - TM5000 Turn O'Matic
4 - SP41-08 Solid Panel
2 - FD41-08 Fold Down Panel
1 - SW800 Swing Slide Gate
3 - CP41-08 Tub Panel
7 - S44 Tee Rods
9 - S38 Linking Rods
$3,880
|
|
System D

|
SYS-D - 1,645 lbs. (748 kg)
EQUIPMENT LIST
1 - TS900 Sorter
1 - HG2 Head Gate
1 - SG1475 3.5 ft. Double Door
1 - SP41-35 3.5 ft. Solid Panel
1 - RS1200 Raceway Support
1 - DP1 Drop Gate
1 - R20 Rope Tie Bar
1 - AB1 Anti Backup
1 - SSD51 Scale
4 - SP41-08 Solid Panel
2 - FD41-08 Fold Down Panel
1 - SW800 Swing Slide Gate
3 - CP41-08 Tub Panel
3 - OP41-08 Open Panel
1 - GP41-08 Gated Panel
1 - GP1485 8-ft Double Door
9 - S44 Tee Rods
18 - S38 Linking Rods
$4,993
|
|
System E

|
SYS-E - 1,859 lbs. (845 kg)
EQUIPMENT LIST
1 - TS900 Sorter
1 - HG2 Head Gate
1 - SG1475 3.5 ft. Double Door
1 - SP41-35 3.5 ft. Solid Panel
3 - RSG24 Stop Gate
1 - DP1 Drop Gate
1 - R20 Rope Tie Bar
1 - TM5000 Turn O'Matic
4 - SP41-08 Solid Panel
2 - FD41-08 Fold Down Panel
1 - SW800 Swing Slide Gate
3 - CP41-08 Tub Panel
3 - OP41-08 Open Panel
1 - GP41-08 Gated Panel
1 - GP1485 8-ft Double Door
11 - S44 Tee Rods
16 - S38 Linking Rods
$5,610
|
|
System F
|
SYS-F - 2,045 lbs. (930 kg)
EQUIPMENT LIST
1 - TS900 Sorter
1 - HG2 Head Gate
1 - SG1475 3.5 ft. Double Door
1 - SP41-35 3.5 ft. Solid Panel
2 - RSG24 Stop Gate
1 - DP1 Drop Gate
1 - R20 Rope Tie Bar
1 - SSD51 Scale
1 - TM5000 Turn O'Matic
4 - SP41-08 Solid Panel
2 - FD41-08 Fold Down Panel
1 - SW800 Swing Slide Gate
3 - CP41-08 Tub Panel
3 - OP41-08 Open Panel
1 - GP41-08 Gated Panel
1 - GP1485 8-ft Double Door
13 - S44 Tee Rods
14 - S38 Linking Rods
$6,582
|
WE RECOMMEND THESE HANDLING SYSTEMS FOR GOATS |
|
|
SYS-G - 725 lbs. (330 kg)
EQUIPMENT LIST
1 - BB2002 Work Platform
1 - RSG24 Stop Gate
4 - SP41-08 Solid Panel
2 - S44 Tee Rods
4 - S38 Linking Rods
$2,130
|
|
|
SYS-H - 1,090 lbs. (495 kg)
EQUIPMENT LIST
1 - BB2002 Work Platform
1 - SSD51 Scale
1 - AB1 Anti Backup
1 - RS1200 Raceway
Support
1 - DP1 Drop Gate
6 - SP41-08 Solid Panel
4 - S44 Tee Rods
8 - S38 Linking Rods
$3,680
|
|
|
SYS-I - 1,259 lbs. (572 kg)
EQUIPMENT LIST
1 - BB2002 Work Platform
2 - RSG24 Stop Gate
1 - DP1 Drop Gate
1 - TM5000 Turn O'Matic
6 - SP41-08 Solid Panel
6 - S44 Tee Rods
4 - S38 Linking Rods
$4,136
|
|
|
SYS-J - 1,445 lbs. (657 kg)
EQUIPMENT LIST
1 - BB2002 Work Platform
2 - RSG24 Stop Gate
1 - DP1 Drop Gate
1 - SSD51 Scale
1 - TM5000 Turn O'Matic
6 - SP41-08 Solid Panel
8 - S44 Tee Rods
4 - S38 Linking Rods
$5,269
|
|
|
SYS-K - 1,808 lbs. (822 kg)
EQUIPMENT LIST
1 - BB2002 Work Platform
2 - RSG24 Stop Gate
1 - DP1 Drop Gate
1 - R20 Rope Tie Bar
1 - SSD51 Scale
1 - TM5000 Turn O'Matic
6 - SP41-08 Solid Panel
1 - SW800 Swing Slide Gate
3 - CP41-08 Tub Panels
10 - S44 Tee Rods
7 - S38 Linking Rods
$6,101
|
|
|
SYS-L - 2,142 lbs. (974 kg)
EQUIPMENT LIST
1 - BB2002 Work Platform
2 - RSG24 Stop Gate
1 - DP1 Drop Gate
1 - R20 Rope Tie Bar
1 - SSD51 Scale
1 - TM5000 Turn O'Matic
6 - SP41-08 Solid Panel
1 - SW800 Swing Slide Gate
3 - CP41-08 Tub Panels
3 - OP41-08 Open Panels
1 - GP41-08 Gated Panel
1 - GP1485 8-ft Double Door
16 - S44 Tee Rods
12 - S38 Linking Rods
$6,945
|